Home / Insight / Crimson BESS Battery Storage Project Improves Energy Reliability with 350-MW / 14 GW/h Battery Storage

Crimson BESS Battery Storage Project Improves Energy Reliability with 350-MW / 14 GW/h Battery Storage

Phoventus - Energy Storage Project
Phoventus was proud to be the Owners Engineer on this important project.

Crimson Storage is the largest battery storage project in the world to reach operation in a single phase, and it is the second largest energy storage project currently operating. Sited on public lands in Riverside County, California, the project holds two long-term energy storage contracts with California’s largest utilities, Southern California Edison (“SCE”) and Pacific Gas and Electric Company (“PG&E”). Both contracts are part of reliability procurements directed by the California Public Utilities Commission (“CPUC”).

Related Insight

Glint and Glare Study

FAA Glint and Glare Study-Airport Solar

Here is the Preliminary Design for 15.5MW Alberta Solar Project. It includes Preliminary layout, equipment selection, energy production analysis. And, most importantly, glint and glare study for the 15MWac project in Alberta, Canada. In July of 2019, The client contracted Phoventus Inc to perform a glint and glare assessment for the proposed solar layout. This assessment uses GlareGauge. That’s a […]

Read more
WRISE

The Women of Renewable Industries and Sustainable Energy (WRISE)

The Women of Renewable Industries and Sustainable Energy (WRISE) event on Building Your Personal Brand took place on October 3rd. Algonquin Power & Utilities Corporation hosted the event in Oakville Ontario. If you’re not familiar with WRISE, they focus on creating a diversified workforce that strengthens the renewables economy in the U.S., and around the […]

Read more
Bloomberg New Energy Finance

Phoventus in the Bloomberg New Energy Finance (BNEF) Tier 1 methodology

Section 1. 0 Excerpt -, Bloomberg 2018 Tier One methodology, Copyright Bloomberg New Energy Finance. Please see the link below for the full document. “Section 1.0 – … recommend that module purchasers and banks do not use this list as a measure of quality, but instead consult a technical due diligence firm such as …. or Phoventus. […]

Read more