Home / Insight / Phoventus in the Bloomberg New Energy Finance (BNEF) Tier 1 methodology

Phoventus in the Bloomberg New Energy Finance (BNEF) Tier 1 methodology

Bloomberg New Energy Finance

Section 1. 0 Excerpt -, Bloomberg 2018 Tier One methodology, Copyright Bloomberg New Energy Finance. Please see the link below for the full document.

“Section 1.0 – … recommend that module purchasers and banks do not use this list as a measure of quality, but instead consult a technical due diligence firm such as …. or Phoventus. These would usually consider what factory the module comes from, as well as the brand. They would then give an informed opinion on whether the modules will perform as expected.”

BloombergNEF PV Module Tier 1 List Methodology

BloombergNEF has developed a tiering system for PV module makers based on bankability. The aim was to create a transparent differentiation between the hundreds of manufacturers of solar modules on the market. This basic categorization serves as an advertisement by certain manufacturers. However, it should never replace a proper due diligence process in product selection. Hence, this document explains the tiering criteria and their limitations.

Why divide the PV market into tiers?

Clients frequently request BloombergNEF for a list of ‘major’ or ‘bankable’ suppliers – in common industry parlance, tier 1 suppliers – for use in manufacturing forecasts, preliminary competitor analysis, and other internal comparisons. It is very common for industry players to refer to ‘tier 1’ players, but these terms are seldom defined or described, which is unhelpful for firms outside the solar industry trying to get a basic overview.

We strongly recommend that module purchasers and banks do not use this list as a measure of quality. Instead, they should consult a technical due diligence firm such as Edif ERA (formerly OST Energy), ATA Renewables, Sgurr Energy, DNV GL, Black & Veatch, TUV, E3, STS-Certified, Clean Energy Associates, Solarbuyer, Pvbuyer, Enertis, Oravia, Leidos Engineering or Phoventus. These would usually consider what factory the module comes from, as well as the brand, and give an informed opinion on whether the modules will perform as expected.

Tier 1

Tier 1 module manufacturers are those which have provided own-brand, own-manufacture products to six different projects, which have been financed non-recourse by six different (nondevelopment) banks, in the past two years.

How can manufacturers improve their ranking?

Since a tier 1 ranking is not a recommendation, we advise manufacturers against spending much energy pursuing it. On the other hand, one of the characteristics of a tier 1 manufacturer is transparency and good data availability.

Read or download the full PDF.

Related Insight

Alberta Solar Projects

Design Engineering Alberta Solar Projects

Preliminary Design For Alberta Solar Projects 35 MW | Solar | Alberta Phoventus developed the preliminary layouts and energy production analysis for two utility-scale solar projects in Alberta, working with the project developer to make suitable equipment selections to meet the project risk profile and utility requirements. We also introduced our client to prospective buyers in the solar […]

Read more
Solar Independent Engineering

NY – Solar Independent Engineering

Solar Independent Engineering (IE engineer); Phoventus provided an Engineering review of the client portfolio of projects. Above all, our scope included estimates of energy production, O&M cost, and module degradation. Therefore, to verify the results, the PV project(s) were modeled in several configurations. Models showed the effects of degradation, highlighted over/underbuilds on subarrays, and subsequent overload losses. […]

Read more

Claresholm Solar Project – Utility Scale PV Independent Engineering

The 132 MWac Claresholm Solar Project is located in the Municipal District of Willow Creek, Alberta. Phoventus acted as an Independent Engineer for one of the potential buyers. In 2019, the project received regulatory approvals from the Alberta Utilities Commission. It executed a 74 MWac power purchase agreement with TC Energy Corporation. Construction is planning to begin […]

Read more