Crimson Storage is the largest battery storage project in the world to reach operation in a single phase, and it is the second largest energy storage project currently operating. Sited on public lands in Riverside County, California, the project holds two long-term energy storage contracts with California’s largest utilities, Southern California Edison (“SCE”) and Pacific Gas and Electric Company (“PG&E”). Both contracts are part of reliability procurements directed by the California Public Utilities Commission (“CPUC”).
BESS Due Diligence | Toronto Ontario | 12 MWh Energy Storage Facility The Toronto Hydro Energy Storage Facility is a 4MWh battery energy storage system. The Energy Battery Energy Storage System (BESS) was designed for smart grid applications. Its aim is to optimize energy balance demand in smart grids to reduce or defer the overall costs of […]
Read moreEnvironmental Support Services String Inverter Status Phoventus is providing off and on-site environmental operational support services for this 75MW wind project. In particular, it is located on Amherst Island in Loyalist Township, Ontario. The Phoventus team provided guidance and support in preparing operations staff for the environmental commitments. In fact, they were required by the project’s […]
Read morePreliminary Design For Alberta Solar Projects 35 MW | Solar | Alberta Phoventus developed the preliminary layouts and energy production analysis for two utility-scale solar projects in Alberta, working with the project developer to make suitable equipment selections to meet the project risk profile and utility requirements. We also introduced our client to prospective buyers in the solar […]
Read more2401 Bristol Cicicle Suite 103,
Oakville ON Canada, L6H 5S9
Tel: 647-797-7926
525 N. Tyron Street, Suite 1600
Charlotte,NC, USA 28202
Rua Olimpiadas 205-4 Andar
Sao Paulo, Brazil
CANADIAN POWER ENGINEERS IS A DIVISION OF PHOVENTUS INC.
COPYRIGHT © 2021 | PHOVENTUS INC. ALL RIGHTS RESERVED